OEM battery engineering
Battery pack sizing & runtime calculator
Estimate the energy needed between charges, compare verified catalog values, and send your sizing for engineering review.
2,750 Wh ≈ 107 Ah at 25.6V
Your sizing estimate
2,750 Wh ≈ 107 Ah
250 W × 8 h ÷ 0.80 × 1.10 at 25.6V
Matching catalog packs
25.6V · 120Ah · 3,072Wh · LFP
+12% headroom · 0.50C at peak
25.6V · 120Ah · 3,072Wh · LFP
+12% headroom · 0.50C at peak
25.6V · 120Ah · 3,072Wh · LFP
+12% headroom · 0.50C at peak
Compare a larger option: LBC24200-1 · 5,120 Wh
Preliminary energy estimate. Confirm current limits, charger, BMS and equipment fit with an engineer.
Send your requirements
Frequently asked questions
Why divide by depth of discharge?
Only the selected fraction of the pack energy is used between charges. Dividing the load energy by that fraction reserves the remaining energy.
Does opportunity charging change the size?
Charging during planned breaks can reduce the runtime needed between charges. Use the longest interval between charging opportunities, then confirm charging and BMS limits for the duty cycle. Read the LFP opportunity-charging guide.
Browse by voltage
12V battery packs24V battery packs36V battery packs48V battery packs72V battery packs96V battery packs144V battery packs