Define the gate
List the technical, quality, source, compliance, capacity, commercial, and documentation conditions the supplier must satisfy.
Lithium Battery Company · OEM Battery Programs
Use this OEM battery supplier prequalification checklist to evaluate custom lithium battery pack partners before issuing an RFQ. Lithium Battery Company supports engineering and procurement prequalification across the US, Canada, and Mexico — since 2014, hundreds of thousands of packs delivered, 389 LFP & NMC designs, CAGE 73P65 / UEI KTAYRM6TT754, catalog MOQs from 10 units, and custom pack programs from 25 units.
A practical qualification framework for reducing battery supplier, component, quality, compliance, and continuity risk.
An OEM should qualify a battery supplier against the actual program—not a generic capability deck. The review should cover engineering fit, cell and component sources, production controls, inspection and testing, traceability, change management, capacity, continuity, data security, commercial terms, and the evidence required before release.
Catalog reference-design programs begin at 10 units and custom programs begin at 25 units. LBC quotes volume OEM battery programs.
For the standards LBC requires upstream suppliers to follow, review the LBC Supplier Code of Conduct, including supply-chain traceability, audit rights and reporting requirements. The page also provides the downloadable PDF.
List the technical, quality, source, compliance, capacity, commercial, and documentation conditions the supplier must satisfy.
Review records, samples, processes, controls, test data, sources, capacity, and corrective-action practices relevant to the pack.
Close critical gaps, document conditions, and establish monitoring, notification, traceability, and change-approval requirements.
A management-system registration can be useful evidence, but it does not by itself prove capability for a specific battery, process, component source, volume, test, or contract requirement.
A risk-based audit may be appropriate. The decision depends on product risk, available evidence, volume, industry requirements, prior performance, and whether an onsite or remote review adds meaningful assurance.
The required records vary, but may include approved BOM and sources, lot traceability, incoming inspection, in-process checks, functional tests, calibration, nonconformance, change notices, and program-specific test records.
Requalification should be triggered by risk and change, such as major source, process, production, design, ownership, quality, capacity, or performance changes, with periodic review where the program requires it.
Procurement and engineering teams can review cell chemistry options (LFP and NMC), automated cylindrical and prismatic pack assembly capability, BMS communication protocols (CANbus, RS485, SMBus), federal registration (UEI KTAYRM6TT754, CAGE 73P65), MOQs (10 catalog / 25 custom), and prototype-to-production lead times via our custom quote form.