Capture the real requirement
Collect drawings, labels, samples, charger data, interface details, load measurements, failure records, and applicable documents.
Lithium Battery Company · OEM Battery Programs
A structured path for OEMs facing supplier failure, discontinuation, quality drift, tariff exposure, or unacceptable lead times.
A battery supplier should be replaced through a controlled technical and sourcing transfer. LBC reviews the incumbent pack, system interface, charger, load profile, dimensions, communications, environment, compliance obligations, failure history, first-order quantity, and forecast before recommending a close reference design, alternate source, or controlled redesign.
Catalog reference-design programs begin at 10 units and custom programs begin at 25 units. LBC does not quote individual retail battery orders.
Collect drawings, labels, samples, charger data, interface details, load measurements, failure records, and applicable documents.
Evaluate a reference design, alternate-source build, or redesign against performance, risk, lead time, cost, and qualification effort.
Confirm fit, function, charging, communications, environmental behavior, safety protections, and production documentation before rollout.
LBC can review an incumbent pack and available system information to define a replacement path. A physically similar pack is not automatically a drop-in replacement; charger, BMS, communications, load, safety, and certification requirements must be verified.
Drawings help, but a program can often begin with samples, labels, equipment information, charger specifications, measured loads, connector pinouts, and operating requirements. Missing data becomes part of the risk and validation plan.
Possibly, but a cell or chemistry change can affect voltage, charging, BMS settings, thermal behavior, enclosure, runtime, certification, and equipment compatibility. It requires engineering review and validation.
Not necessarily. The goal is a verified replacement that meets the controlled system requirements. Construction details or sources may differ, and those differences must be documented and approved.